Skip to content
Sunshine Station

Sunshine Station

Southbound view of Sunshine station from platform 1, July 2026
Southbound view from platform 1 at Sunshine station, under the concourse, 8 July 2026. Photograph by LachlanTansey, CC BY 4.0, via Wikimedia Commons.

Railway station in Sunshine, on the Sunbury line. Melbourne Airport Rail stage 1 adds two platforms here for regional services and rebuilds the station precinct. The line to the airport is a later stage. The photograph is the station in July 2026, looking south from platform 1.

Station facts

Reviewed 2026-10-27.

Status: Operating

Zone. 1 and 2

Recorded 2026-10-27. Metro Trains Melbourne

What is changing

The stage now under way is the West Footscray to Albion upgrade, including this station. On 21 October 2026 Big Build named CPB Contractors and SMEC, as the Network Integration Program Alliance, as preferred bidder for the package that expands the station. The announcement describes two new platforms for regional trains, so airport trains can use the existing platforms, plus an extended concourse and new forecourts. A preferred bidder is not a finished station, and it is not the airport line.

Big Build says stage 2 will be complete in 2031. That stage is a line from Albion to Keilor East, with a station at Keilor East. The year is the project’s stated target for stage 2. It is not a date for the station package above.

Location and access

The address is Hampshire Road and Station Place, Sunshine 3020. The station sits at the junction of the Sunbury line and the regional lines toward Ballarat and Geelong, which is why the rebuild adds platforms for regional services.

Sunshine station and the surrounding streets
Sunshine station, Hampshire Road and Station Place. Map data © OpenStreetMap contributors, via Wikimedia Maps, retrieved 27 October 2026.

Services and interchanges

The metropolitan service is the Sunbury line, which is the line this directory records. V/Line trains on the Ballarat and Geelong lines also stop. Bendigo line trains pass through and do not stop. Since 9 November 2025, SkyBus has run a direct service between this station and Melbourne Airport; that is a bus, not the future train. The extra platforms in the February 2026 designs are for regional services, and they are part of the stage being built, not a service that is already running to the airport.

Facilities and accessibility

FeatureAvailability
LiftYes
EscalatorsNo
Independent boardingIn part, platforms 2, 3 and 4
Shelter in the accessible boarding areaIn part, platforms 1, 2 and 4
Low platformNo
Platform edge tactiles or screen doorsYes
Hearing loopYes
Paths at least 1200 mm wideNot all paths
Accessible toiletsSome have specific opening hours, or are not available when the station is unstaffed

Recorded 2026-10-27. Metro Trains Melbourne

  • Customer service staff
  • Parking
  • Accessible parking
  • Bicycle facilities
  • Pick-up / drop-off
  • Defibrillator
  • Passenger information display screens

Recorded 2026-10-27. Metro Trains Melbourne

The station is at ground level, with four platforms over five tracks: two side platforms and one island. The concourse is the footbridge across the platforms, added with the bus interchange in the Regional Rail Link rebuild.

Projects affecting the station

The works here are Melbourne Airport Rail stage 1: the station rebuild and the corridor from West Footscray to Albion. The airport connection is a later stage, and the stage investment is not a budget for it.

Station precinct

The rebuild of the station precinct sits in that same West Footscray to Albion stage. South of the station, a signal control centre has been under construction since early 2020 to share control of the Sunshine-Dandenong corridor once the Metro Tunnel is running. The Sunshine suburb page separates the current stage from Brimbank’s 2022 precinct masterplan, including the council’s $143 million figure and the separate stage investment.

History

The station opened on 7 September 1885 as Braybrook Junction, at the junction of the Bendigo and Melton lines. It was renamed Sunshine in 1907, after Hugh McKay moved his Sunshine Harvester Works to the site beside it. On 20 April 1908 the Sunshine train disaster killed 44 people, the worst crash in Victorian railway history. The road crossing at the station was grade separated in 1961.

The station was rebuilt between 2012 and 2014 as part of Regional Rail Link, which gave it the bus interchange, the concourse and footbridge, and the two regional platforms it runs on today. The 1914 signal box north of the station closed in 2016, when control moved to Metrol.

Recent verified changes

  • 21 October 2026. Big Build named CPB Contractors and SMEC as preferred bidder for the station package, including two new platforms for regional trains. The announcement is a procurement step. It is not the opening of those platforms, and it is not the airport line.
  • Soil testing around the station was scheduled from 29 September to 14 October 2026, between 7am and 6pm. A notice dated 22 September 2026 sets it in the rail reserve between Anderson Road and the station, then in the Station Place bus area, the Sun Crescent car park, and the western car park. It is preparation for construction, not the new station, and it is described as scheduled rather than finished.
  • In April 2026, boring started on a jet-fuel pipeline tunnel, about 2 km, between Sunshine and Albion. The existing pipe is being moved about 30 metres underground so the new platforms and concourse can be built.

Official information and sources